They're at 100,000 watts now. Not knowing what the CP said, I'd assume the higher tower would have been at a lower power.
Nope, thats why they filed to upgrade the class from C1 to C0, so they could remain at 100kW
First the app: The app called for 100kW ERP combined into the 97.9 & 105.5 antenna at the tower at 410 meters, versus the current licensed facility of 100kW @ 182 meters.
Secondly, a C0 is 100kW up to 450 meters, while a C1 is 100kW up to 300 meters. (A C is 100kW up to 600 meters)
The app had a couple of minor objections filed against it.
Hope this helps somewhat understand better.